7/20/2020 Update: This week, the Contractor will be working along Tidi and Banner. Contractor will work along Gerka if he gets to the Donzi and Banner Intersection. Contractor will also be working between Well #6 and Well #7 once the locates are completed and possibly the line between Upper and Lower Gerka.